Data Center Sentinel
Inspection intelligence for data halls, critical equipment, and restricted facility zones.
Xolver helps facility teams evaluate data-center conditions with mobile inspection, environment twins, facility-system context, local runtime checks, and reviewable evidence.
Corroborate before escalating.
Data-center incidents rarely live in one signal. Xolver can correlate robot observations with thermal, BMS, DCIM, access-control, and security signals before escalating an incident or blocking an unsafe route.
The qualification path matters.
Deployment starts with assessment, simulation/replay, connector validation, and bounded pilot review before any production facility integration.
Inspection intelligence with boundaries and evidence.
Local operation
Keep inspection checks, route state, and incident records close to the facility environment.
Site boundaries
Represent restricted racks, facility zones, aisle constraints, and keepout areas as reviewed operating context.
Route validation
Check whether a mobile inspection route remains acceptable before treating movement as available.
Evidence records
Preserve what was observed, corroborated, blocked, and reviewed for facility-team follow-up.
Readiness gates
Move from assessment to replay, connector validation, and pilot only when the current evidence supports it.
Validate Routes
Review aisles, rack boundaries, restricted zones, and temporary obstructions before an inspection route advances.
Check Connectors
Confirm that facility sources are configured, authenticated, fresh, schema-valid, and ready for the current review stage.
Leave Evidence
Keep a reviewable trail of observations, corroboration, route decisions, blocked reasons, and pilot-readiness state.
Evaluate a bounded data-center pilot.
FAQ
Is this production-ready data-center autonomy?
No public claim should be read that way. Data centers are a supported application path, starting with assessment, simulation or replay, connector validation, and bounded pilot review before production facility integration.
Which facility systems can be part of the review?
The data-center path is shaped around video, thermal, BMS, DCIM, access-control, SIEM, edge runtime, and evidence-writer signals, subject to connector validation at each site.
What happens when observations are not corroborated?
The workflow should hold, block escalation, or request review instead of treating one stale or isolated signal as a verified incident.